Engineering design is underway on the 31st Avenue SE Reconstruction project, from Broadway to 13th Street SE.

The project is set to make improvements that will look and feel very similar to the improvements made to 37th Ave. SE a few years ago. There will be curb and gutter along the entire road, and storm water inlets will be installed. As well, water drainage will be improved throughout the corridor, intersections will be made ADA compliant and the walking path will be improved. The proposed road will be concrete, as this route is designated as an urban arterial roadway.

This project is scheduled to go through design and engineering services until late 2019. It would be bid out for construction shortly after design is complete, with a full season of construction happening in 2020. 

Click on the Frequently Asked Questions to the left for more information on this project and click here for a pdf copy of the PowerPoint presentation given at the Public Input Meeting in January 2019. 

If you were unable to attend the meeting and would like to provide comments about the project, please download the comment sheet here, and send it in to Josh Olson with Apex Engineering, at Josh.Olson@apexenggroup.com by no later than January 30.


Project Conceptual Design, January 2019