2020 Construction Season is Underway

The Minot 31st Avenue Project started construction April 13. The first phase of construction includes the closure of the intersection of 31st Avenue Southeast and 13th Street Southeast. This intersection is where the first roundabout in Minot will be located. 
 
Residents in the area are encouraged to utilize 37th Avenue Southeast for access to and from the area off of South Broadway. 31st Avenue Southeast will remain open through 11th Street for local access. Both 12th and 13th Streets will not have access directly off 31st Avenue.
 
The North Dakota Department of Transportation has issued COVID-19 Spring Construction Project Guidance that will be followed. At this time, no restrictions have been put in place for the construction industry.
 
The driving public should use caution and pay attention as this work begins. Throughout the project, access to residents, the school, the Minot Country Club and Elevation will be maintained.
 

Project Information

Engineering design is now complete on the 31st Avenue SE Reconstruction project, from Broadway to 13th Street SE. The project was bid out for construction in late 2019, with Minot City Council approving award of the contract to Wagner Construction in early December 2019. Construction is estimated to start in spring 2020. 

The project will make improvements that will look and feel very similar to the improvements made to 37th Ave. SE a few years ago. There will be curb and gutter along the entire road, and storm water inlets will be installed. As well, water drainage will be improved throughout the corridor, intersections will be made ADA compliant and the walking path will be improved. The proposed road will be concrete, as this route is designated as an urban arterial roadway.

A public input meeting was held in January 2019 to discuss the early design associated with the proposed improvements to the nearly one-mile stretch of 31st Avenue SE in Minot. Click here for a copy of the handout given out during the presentation and click here for a pdf copy of the PowerPoint presentation that was given by the engineering team.

Please sign up for email alerts on the latest information about the project by entering your email address in the "Keep Me Informed" box to your right.  


 

Public Information Meeting Handout - click here to download a pdf

Keep Me Informed:

* Email: