Archived Alternatives – South Project
Alternatives
Alternative A: No Build
This is the non-preferred alternative as it does not address the project purpose and need.
Estimated Cost $0
Alternative B with Pond Scenario 1 - Single Pond
Full reconstruction to a five-lane section:
61-foot wide concrete pavement including gutter pan
Four 11-foot wide thru lanes, a 13-foot center left turn lane, and 2-foot wide gutter pans on each side
Reconstruction of Burdick Expressway 300 feet east and west of 16th Street SW
Four 12-foot wide thru lanes, an 11-foot wide left turn lane, and 2-foot wide gutter pans on each side
10-foot wide shared use path/ADA ramps along the east side of 16th Street SW
New transition speed zone (30 MPH) from 11th Avenue SW to Burdick Expressway
Turn lane recommendations from the Traffic Operations Report
New traffic signal system at 11th Avenue SW and revised traffic signal at Burdick Expressway
New lighting on 16th Street SW
New storm sewer trunk line
Drainage improvements at 12th Avenue SW, east of 16th Street SW
Single retention pond located in the SW quadrant of 16th Street SW and 11th Avenue SW
Estimated cost $14,020,200
Alternative B with Pond Scenario 3A - Two Tiered Pond
Same improvements as listed above for Alternative B with Pond Scenario 1 (Single Pond), except:
Two-tiered retention pond with smaller pond located in the SW quadrant of 16th Street SW and 11th Avenue SW, and larger pond located on same property further south
Estimated cost $15,202,500
More
Less
South Project (2025 Construction)
North Project