Will 16th Street SW remain open to traffic during construction of the North Project?
Yes and no, depending on the corridor segment:
- The segment from 7th Ave SW to 5th Ave SW is expected to be closed with traffic detoured.
- Residents with direct access to 16th St SW must temporarily park on side streets.
- The 16th St SW bridge over the Mouse River will remain open to traffic as much as possible, depending on the intersection options selected at 7th Ave SW and 5th Ave SW.
Will you need additional right of way/easements from my property for the North Project?
ROW needs for the North Project will be determined once the Preferred Alternative/Options are selected for that project at a future date (TBD).
How will the North Project be funded?
Total project costs for construction, engineering, and right-of-way acquisition for the North Project are currently estimated at $10.82 M - $12.35 M
(2028 dollars)
Cost estimates are preliminary and subject to change. No special assessments are expected at this time. Funding will be a combination of the following:
- Federal funds ($5.10 M - $5.56 M)
- City funds ($5.72 M - $6.79 M) from Hub City Oil and Gas Funds and Water and Sewer Reserves.
How can I stay up to date during project development and construction?
Project updates will be posted to the following locations:
There is also a designated Public Information Coordinator – Kelly Nissen – available during design and construction to address specific issues or communicate needs. Kelly can be reached at 701.833.2019 or